A project announced in Edgewater and a project actually under construction are not the same thing, and the difference shows up in the county permit record. A buyer abroad can check it without flying in.

Sales material is produced before the building exists: a sales gallery, renderings and a scale model can be ready while the land still has no foundation permit. Knowing where the permit file stands changes what you are buying, because a project with an approved vertical permit and a crane on site carries a different risk from one still in municipal review. That information is public and free, and the seller does not control it.

What is specific to Edgewater

A narrow strip between Biscayne Boulevard and the bay, north of downtown, where nearly every tower is recent. New waterfront towers and still-unrenovated inland blocks, one street apart. No Metromover station of its own; you depend on Biscayne Boulevard and the city trolley.

  • whether the unit faces the bay or Biscayne Boulevard, because the two sides of the same tower are not the same home
  • what is built across the street and what is approved to be built, because a bay view disappears with the next tower
  • the elevation of the parcel, given how close it is to the water

What to verify, step by step

  1. Ask for the project's exact address and parcel number, not the marketing name, because permit files are searched by parcel.
  2. Look that parcel up at the county permitting centre and see which permits are open, closed or merely applied for.
  3. Check the county appraiser's record for what stands on that land today: if it still shows vacant or an older structure, the work has not progressed.
  4. Ask in writing what stage construction is at and request the date of the last approved inspection report, not a verbal description of progress.
  5. If you cannot travel to Edgewater, commission a Florida-licensed broker or an independent inspector to visit and send dated site photographs.
  6. Ask about the city or town permit as well, because the municipality and the county run separate processes.

Mistakes that cost money

  • Confusing the sales launch with the construction start: the sales gallery opens long before the structural permit.
  • Accepting undated photographs, or a crane from a neighbouring project, as proof of progress.
  • Assuming an applied-for permit is an approved permit.

Frequently asked questions

How do I know the project I am being offered really exists?
Through the parcel. With the exact address and parcel number you can pull the county permit file and the appraiser's record, and both sources are public and free.
Can I verify progress without travelling to Edgewater?
On paper, yes: permits and approved inspections are searchable online. For the physical state of the site it is worth commissioning a visit with dated photographs from someone licensed in Florida.
Which permit shows that construction has started?
It depends on the project and the municipality, which is why you read the whole file rather than trusting a single document. The county permitting centre shows the sequence and the dates.

Where to check it

Official bodies. Specific figures are requested there, not copied from a listing.

Updated 2026-11-04

This article in other languages EspañolPortuguês

Interested in a property in this area?

Write to us and we will send you the available options.

Dimare Collection does not sell or broker property in Miami. This is an informational page: transactions are carried out by brokers licensed in the state of Florida. This text is not legal, tax, immigration or mortgage advice; it describes what to ask and whom to ask. The rules and bodies cited can change: always confirm with the official source. Operated by Nisimblat Consulting SAS.