The building permit in Bocagrande: what it authorises and how to check it

Bocagrande, Cartagena de Indias

The permit is the only document that states what may be built on a property in Bocagrande, and almost nobody asks for it before signing. When it turns out to be expired, amended or issued for another lot, the project you bought is no longer the one that was authorised.

The licencia de construcción and the licencia de urbanismo (building and subdivision permits) are issued by a curaduría urbana, a private body exercising a public function, and they are checked there by property and by filing number. A permit authorises something specific: an use, a number of units, a height, setbacks and a term. It does not authorise the brochure. It can be expired, it can have been amended after issue, and it can cover the neighbouring lot rather than the one on offer. None of that is visible on a site visit, and all of it can be checked in writing from abroad.

Bocagrande works like a mature resale market, with consequences that do not repeat up north. The counterparty is almost never a builder: it is a long-standing owner or, very often, an unsettled sucesión, an estate proceeding, whose heirs live in different countries, so closing depends not on one power of attorney but on several, and on the partition among them. The registry record is old too: it was opened when the building was submitted to the condominium regime, it carries legacy entries such as cancelled mortgages, patrimonio de familia and afectación a vivienda familiar, both family-home protections, or lifted attachments, and the recorded area does not always match a current survey, so you compare the registry record against the deed and against the unit's floor plan. The peninsula is also land reclaimed from the sea under subdivisions the District authorized in their day, and the oldest deeds still carry references to those parcelaciones, the original platting. Day-to-day power sits with the owners' assembly and its manager, so in a tower with a long record of decisions the minutes and the status of the condominium's lawsuits matter more than the brochure.

What is specific to Bocagrande

Cartagena's dense, vertical peninsula: open sea on one side, bay on the other, and built out to the last lot. Condominium towers from very different eras, from the sixties to recent construction, on the same block. Groceries, restaurants and beach are walkable, and access is through a few roads that saturate in high season.

  • the building's actual age and whether it has a structural vulnerability study, since much of the stock was built under seismic codes earlier than those now in force
  • what the condominium bylaws say about daily rentals, which on this peninsula is the difference between being able to rent and not
  • how many parking spaces the unit holds in the deed, not in the brochure, because older towers do not have one per apartment

What to verify, step by step

  1. Ask for the complete permit, not the cover page: what it authorises sits in the resolution and the approved drawings.
  2. Confirm the registry folio on the permit is the one for the property offered to you in Bocagrande, not a larger parcel or an adjoining lot.
  3. Ask the curaduría urbana whether the permit is current, whether it was extended, and whether it was later amended, and ask for the amending act.
  4. Compare the use, the unit count and the height on the permit against the commercial offer; where they differ, ask which of the two is going to be brought into line.
  5. Check in addition what Bocagrande requires in particular, with the authority that imposes it: the building's actual age and whether it has a structural vulnerability study, since much of the stock was built under seismic codes earlier than those now in force; what the condominium bylaws say about daily rentals, which on this peninsula is the difference between being able to rent and not and how many parking spaces the unit holds in the deed, not in the brochure, because older towers do not have one per apartment.

Mistakes that cost money

  • Accepting the permit the seller shows you without checking it at the curaduría. A printed document does not say whether it is still current today.
  • Confusing the licencia de urbanismo with the licencia de construcción. The first enables the land, the second the building: it is the mistake of someone buying a developable lot, not of someone buying a finished apartment.
  • Treating advanced construction as proof of authorisation. In an already built tower what you compare is what stands against the approved drawings, and that is not done on a site visit.

Frequently asked questions

Can I check the permit for a Bocagrande property from outside Colombia?
Yes, in writing to the curaduría urbana that issued it, with the filing number or the property address. You do not need to be in Cartagena for that.
What does it mean if the permit has expired?
That the act had a term and the term ran out. What that means for your particular case comes from the curaduría and your own lawyer, not from an article.
Does the permit tell me the height and setbacks for the lot?
Those come from the POT rules for the polygon and are then fixed in the permit. Ask the curaduría for them for that specific property: we publish no figures here.

Where to check it

Official bodies. Specific figures are requested there, not copied from a listing.

Updated 2026-11-05

This article in other languages Español

Interested in a property in this area?

Write to us and we will send you the available options.

Dimare Collection does not sell or broker property in Miami. This is an informational page: transactions are carried out by brokers licensed in the state of Florida. This text is not legal, tax, immigration or mortgage advice; it describes what to ask and whom to ask. The rules and bodies cited can change: always confirm with the official source. Operated by Nisimblat Consulting SAS.