A project announced in Key Biscayne and a project actually under construction are not the same thing, and the difference shows up in the county permit record. A buyer abroad can check it without flying in.
Sales material is produced before the building exists: a sales gallery, renderings and a scale model can be ready while the land still has no foundation permit. Knowing where the permit file stands changes what you are buying, because a project with an approved vertical permit and a crane on site carries a different risk from one still in municipal review. That information is public and free, and the seller does not control it.
Key Biscayne moves through a different channel because the village keeps its own permit counter and because everything that reaches the island crosses a single bridge. For a buyer abroad that is not scenery, it is logistics. The contractor quoting a renovation prices in travel and the delivery window in which material can be unloaded; the appraiser and the inspector your lender sends depend on that same bridge; and scheduled work can stop because of a closure nobody told the buyer about. On top of that, the county does not grant the approval: height, setback, landscaping and dune protection rules are set by the village, and when the parcel touches the shore a state authority enters as well, so a wall, a dock or a pool may require more than one file. Ask your insurance broker how the carrier reads the exposure of that specific parcel and what it requires before issuing; ask your closing attorney whether dune restrictions or easements are recorded on title; ask the village which work is approved at the counter and which goes before a board. It also pays to learn who manages the building or the association, because on a small island the manager is the person who actually answers.
What is specific to Key Biscayne
A barrier island with its own village government, reached only by the Rickenbacker Causeway, with large parks at both ends. Oceanfront towers, low-rise buildings and a core of single-family homes inland. A single tolled road in; there is no rail and no alternative if the causeway closes.
- what the single road implies: evacuation, rush hour and closures for works or events
- the parcel's coastal exposure and what that means for insurance
- the village's own rules, which are not the county's
What to verify, step by step
- Ask for the project's exact address and parcel number, not the marketing name, because permit files are searched by parcel.
- Look that parcel up at the county permitting centre and see which permits are open, closed or merely applied for.
- Check the county appraiser's record for what stands on that land today: if it still shows vacant or an older structure, the work has not progressed.
- Ask in writing what stage construction is at and request the date of the last approved inspection report, not a verbal description of progress.
- If you cannot travel to Key Biscayne, commission a Florida-licensed broker or an independent inspector to visit and send dated site photographs.
- Ask about the city or town permit as well, because the municipality and the county run separate processes.
Mistakes that cost money
- Confusing the sales launch with the construction start: the sales gallery opens long before the structural permit.
- Accepting undated photographs, or a crane from a neighbouring project, as proof of progress.
- Assuming an applied-for permit is an approved permit.
Frequently asked questions
- How do I know the project I am being offered really exists?
- Through the parcel. With the exact address and parcel number you can pull the county permit file and the appraiser's record, and both sources are public and free.
- Can I verify progress without travelling to Key Biscayne?
- On paper, yes: permits and approved inspections are searchable online. For the physical state of the site it is worth commissioning a visit with dated photographs from someone licensed in Florida.
- Which permit shows that construction has started?
- It depends on the project and the municipality, which is why you read the whole file rather than trusting a single document. The county permitting centre shows the sequence and the dates.
Where to check it
- Miami-Dade Permitting and Inspection Center — open or closed building permits on an address
- Miami-Dade County Property Appraiser — record card, area, year built and parcel history
- Miami-Dade Board of Rules and Appeals — the county's building recertification programme
- Florida DBPR — whether a broker, appraiser or contractor holds a current licence
- Village of Key Biscayne — the rules of the municipality Key Biscayne belongs to
Official bodies. Specific figures are requested there, not copied from a listing.
Updated 2026-11-06
More about Key Biscayne
- New Developments in Key Biscayne: How to Compare Projects
- Pre-Construction Deposits in Key Biscayne: Payment Schedules and Buyer Questions
- Real Estate Developers in Key Biscayne: How to Review a Developer’s Track Record
- Price Ranges for New Condos in Key Biscayne: What Affects Asking Prices?
- Condo Price Ranges in Key Biscayne: How to Compare Similar Properties
The same, in other neighbourhoods
- Apartments Under Construction in Miami Beach: What International Buyers Should Know
- Apartments Under Construction in Surfside: What International Buyers Should Know
- Apartments Under Construction in Bay Harbor Islands: What International Buyers Should Know
- Apartments Under Construction in Sunny Isles Beach: What International Buyers Should Know
Interested in a property in this area?
Write to us and we will send you the available options.