Taking delivery of an office unit in Crespo: what the acta has to record

Handover is the one moment when the buyer has the property in front of him and still holds something to pay or to demand. Whatever is left out of the acta that day stops being a claim and becomes a conversation.

Taking delivery of an office unit is not signing that the keys arrived: it is recording the condition in which the property is received, the open items, and how and when they will be addressed. The acta de entrega is a private document between the parties, and its worth lies in its detail: an inventory of what is handed over, meter readings, the state of finishes and equipment, keys and remotes, and the list of observations signed by both sides. New construction adds the recibo de obra and whatever the builder has warranted; a resale adds whatever the seller undertook in the promesa de compraventa, the binding promise of sale. After handover the claim changes counterpart: it stops being a conversation with a seller or a builder and becomes a contractual matter, which is where it starts to matter whether there are proceedings open against the person who sold to you.

An office unit is bought differently because it does not live on passing footfall but on the building's ability to work as a business address. What makes it usable are services the unit does not control: the hours lifts and security actually run, the air conditioning and how it is metered, backup power, connectivity and visitor parking. None of that is fixed inside the unit and all of it runs through the administración, so the review looks at the building rather than at the door. The second difference is destinación, the recorded permitted use: in mixed-use towers, units whose registered use is residential are routinely sold as offices, and the mismatch between what the deed says, what the reglamento allows and what planning rules require is what later blocks registering the activity or receiving the public. The third is the rental market: an office tenant is a company choosing on address, floor area and building services, and is replaced by another of the same kind, so occupancy depends on the state of the whole tower far more than on the state of the unit.

Here the file is complicated by a neighbor nobody negotiates with: the air terminal. The neighborhood sits under the approach path, so a building project is not reviewed only by the curaduría urbana, the private office that grants permits, but also by the civil aviation authority, which sets the obstacle limitation surfaces, and by the operator running the airport under concession. That reorders the procedure: before buying with any plan to add height, request the land-use opinion from the District and ask about the aviation ruling, because that is where a seller's assumptions collapse. On top of height there is noise exposure, which never appears on the certificado de tradición y libertad, the registry history and encumbrance certificate, and does appear in the airfield regime, so the exposure sits in the rules over the land rather than in the title itself. The counterparty differs too: a formal neighborhood of long-standing owners, with unsettled sucesiones, estate proceedings, and houses carved into several apartments without registering the split, so compare the original permit against what stands before accepting a per-unit valuation.

What is specific to Crespo

The neighborhood you cross to enter or leave the city: residential, fully built out and pressed against the air terminal, with its own seafront. Family houses and residential buildings sit alongside apartments used for short stays because of how close the terminal is. It is the hinge between downtown and the Zona Norte: the exit to the Anillo Vial and the way into Rafael Núñez airport both run through it.

  • what building height the lot allows under the airport approach path, because the aviation restriction stacks on top of District zoning and is the first fact left out when a lot is offered
  • whether what stands matches the permit and the registry folio, a common gap in family houses split into apartments without registering the split
  • how shoreline protection in front of the property was resolved and which body answers for that work, because it is not the seller

What to verify, step by step

  1. Ask for the acta template before the appointment and read it with your lawyer: anything without a field will not get written down.
  2. Walk the property with the permit and the approved drawings in hand and compare what was built against what the curaduría authorised.
  3. Put meter readings, the inventory of keys and remotes, and every observation with the open item it creates in writing.
  4. Check the handover points that belong to office units: whether the deed's permitted use is office or residential, because in mixed-use towers residential units are routinely sold as offices; the hours the lifts, air conditioning and security actually operate, and whether use outside those hours is billed separately and whether the administración requires a declared destinación (recorded permitted use) and prior notice to receive the public, and which visitor parking is assigned to the unit.
  5. Add what has to be verified in Crespo: what building height the lot allows under the airport approach path, because the aviation restriction stacks on top of District zoning and is the first fact left out when a lot is offered; whether what stands matches the permit and the registry folio, a common gap in family houses split into apartments without registering the split and how shoreline protection in front of the property was resolved and which body answers for that work, because it is not the seller.
  6. If you cannot attend, grant a power of attorney to someone who receives on your behalf, and require the signed acta plus photographs and video of the walkthrough the same day.

Mistakes that cost money

  • Signing the acta with no observations so as not to delay handover. It is the most expensive waiver in the process, and it is made out of politeness.
  • Taking delivery without clearance certificates for dues and utilities. The unpaid account follows the property, not the seller who left.
  • Leaving an open item in a WhatsApp message. The acta gets signed; the message gets deleted.

Frequently asked questions

Can I take delivery of an office unit without travelling to Cartagena?
Yes, with a power of attorney granted before a Colombian consul or apostilled. Whoever receives should be someone technical, not the same broker who sold it.
Who do I claim from after handover?
It depends on what was signed: the builder for what was warranted, the seller for what was promised, and the administración for anything that is common property. That is why the acta is drafted with names in it.
Is video of the walkthrough worth anything?
It backs up what was written in the acta. It does not replace it: the signed document is what binds.

Where to check it

Official bodies. Specific figures are requested there, not copied from a listing.

Updated 2026-11-06

This article in other languages Español

Interested in a property in this area?

Write to us and we will send you the available options.

Dimare Collection does not sell or broker property in Miami. This is an informational page: transactions are carried out by brokers licensed in the state of Florida. This text is not legal, tax, immigration or mortgage advice; it describes what to ask and whom to ask. The rules and bodies cited can change: always confirm with the official source. Operated by Nisimblat Consulting SAS.