A title review tells you who may sell; a technical inspection tells you what is being sold. They are two separate engagements, both paid for by the buyer, and in Manzanillo del Mar the second one is usually skipped because the buyer is not in the city to open the door.
What gets inspected is not the same checklist for every property: when what you are buying is a retail unit, the report has to address what the nature of that property actually puts at risk, not a generic form about damp patches and sockets. That matters for money and for timing. For money, because a repair not found before the promesa de compraventa is signed gets paid for afterwards by the buyer, and in a propiedad horizontal (condominium regime) it can end up shared among all owners through a special assessment. For timing, because before the promesa whatever turns up is a matter for negotiation, and afterwards it is only a claim. The report is signed by a professional who answers for what it says; nobody signs the brochure.
A retail unit is bought differently because you are not buying a space but the possibility that someone can trade in it, and that possibility is granted by third parties. Two permissions are needed and nobody bundles them: the one the land-use rules give for that specific lot, and the one the copropiedad's reglamento gives, which need not agree. On top of those sit the tenant's own business permits, applied for activity by activity. The second difference is the relationship with the tenant. A lease of premises for commercial purposes runs under rules distinct from residential tenancies, with an expectation of continuity for the tenant that is worth having a lawyer spell out before signing, because the buyer steps into a contract that already exists and inherits its history. The third is that the unit depends on what lies outside it: façade, signage, pavement, loading area and public access are normally bien común, common property, or public space. What makes the unit profitable, in other words, is not inside its walls and is not decided from within the unit.
In Manzanillo del Mar the difficulty is not reading a registry record: often there is none to read. Much of what is offered never entered the registry at all, and what the counterparty holds is possession documented in private papers, with an acta de colindantes, a neighbors' boundary statement, and sometimes a sworn declaration before a notary, none of which is title of ownership. That moves the process to authorities absent in the other sectors: the Agencia Nacional de Tierras, the national land agency, where the soil belongs to the Nation; IGAC, the cadastral institute, and the district cadastre to identify the parcel; and the corregidor or the police inspector when occupation is disputed. Verification becomes a matter of fieldwork and mapping before notarial work: comparing the survey against the cadastral record and against what is actually fenced, because the same lot has been sold under different descriptions. The counterparty is usually a local family or a go-between with no written mandate, and that mandate has to be requested. Infrastructure is not handled by any single utility: a well or tanker water, a septic pit, and a side road whose upkeep is not always assigned to anyone.
What is specific to Manzanillo del Mar
A beach village north of Serena del Mar, where the original town still sits alongside the new complexes. A mixed market: social housing, beach condominiums and unserviced lots. Access is via the Manzanillo road off the Anillo Vial; the final stretch is not always paved to the same standard.
- whether the lot is public wasteland of the Nation, in which case it is allocated rather than sold and no private deed can cure it
- whether there is a right of way to the beach and where it runs, a constant source of litigation between neighbours
- the land use the POT assigns it, because much of what is marketed as residential is still classified otherwise
What to verify, step by step
- Ask the curaduría urbana (the private permitting office) for the licencia de construcción and the approved plans, and check what use, area and height that permit actually authorised against what you are being shown. Anything built beyond it is not cured by the deed.
- What the report has to address point by point for a retail unit: whether the POT (the city's land-use plan) allows commercial use on that specific lot and whether the reglamento de propiedad horizontal admits it — two separate permissions, and you need both; whether the particular activity planned requires a concepto de uso de suelo (a land-use ruling) and who applies for it, owner or tenant and how façade, signage, pavement and loading area are allocated, since these are usually bien común even though the unit uses them daily.
- And what the same report should pick up for the sector in Manzanillo del Mar: whether the lot is public wasteland of the Nation, in which case it is allocated rather than sold and no private deed can cure it; whether there is a right of way to the beach and where it runs, a constant source of litigation between neighbours and the land use the POT assigns it, because much of what is marketed as residential is still classified otherwise.
- Engage the visit with an engineer or architect you hire yourself, not the one the seller offers, and require a written report with dated photographs, a signature and the professional's licence number. Ask Camacol Bolívar who carries out technical surveys in the region and ask for references you can check.
- Agree in writing with the seller on the date of the visit and on access to the property before signing the promesa, and attach the report to the promesa together with the agreed repairs and who pays for them.
- Ask the District whether any administrative proceeding is open against the property for building without a permit or for breaching planning rules, because that follows the property and not the seller.
Mistakes that cost money
- Accepting the report the seller or the developer hands over. The useful report is the one the buyer commissioned and can question.
- Leaving the inspection until after the promesa, when the price is already agreed. Whatever surfaces then is argued from the weaker position.
- Confusing the technical inspection with the title review. One looks at the construction and the other at the chain of ownership; you need both, and not from the same person.
Frequently asked questions
- Can the inspection be done without being in Cartagena?
- Yes, and it usually is: you hire the professional, arrange access with the seller and receive the signed report. What you should not delegate is choosing who does it.
- Does the inspection change with the type of property?
- In substance, yes. What has to be verified on a retail unit comes from the nature of the property —what is privately owned, what is common property, what the permit authorises— and not from a general list of finishes.
- Who pays for repairs the report turns up?
- Whoever agreed to in writing. If the report is attached to the promesa with the fixes and who owes them, you have something to enforce; if it lives in an email, you do not.
Where to check it
- Curadurías Urbanas de Cartagena — whether a current building or subdivision permit exists and exactly what it authorises
- Camacol Bolívar — the industry's own figures on housing starts and launches in Bolívar
- Alcaldía Mayor de Cartagena de Indias — property tax, betterment levies and District procedures
- Cartagena de Indias — the rules of the municipality Manzanillo del Mar belongs to
Official bodies. Specific figures are requested there, not copied from a listing.
Updated 2026-11-06