A title review tells you who may sell; a technical inspection tells you what is being sold. They are two separate engagements, both paid for by the buyer, and in Crespo the second one is usually skipped because the buyer is not in the city to open the door.
What gets inspected is not the same checklist for every property: when what you are buying is an off-plan new construction, the report has to address what the nature of that property actually puts at risk, not a generic form about damp patches and sockets. That matters for money and for timing. For money, because a repair not found before the promesa de compraventa is signed gets paid for afterwards by the buyer, and in a propiedad horizontal (condominium regime) it can end up shared among all owners through a special assessment. For timing, because before the promesa whatever turns up is a matter for negotiation, and afterwards it is only a claim. The report is signed by a professional who answers for what it says; nobody signs the brochure.
Off-plan new construction is bought differently because at signing the property does not yet exist: what exists is a project, a permit and a company that has to stay standing until delivery. The document, not the apartment, is therefore what gets reviewed. The first thing that changes is the path of the money: instalments are paid into a patrimonio autónomo —a trust estate— administered by a fiduciaria rather than into the builder's own account, and it is worth knowing what conditions must be met before those funds are released to the works. The second is that what you sign may be a promesa de compraventa, a binding promise of sale, or only an encargo fiduciario, a trust deposit instruction; they do not bind alike and do not unwind alike, and what happens if the project never starts depends on which one it is. The third is that the unit's identity rests on a plan that allows adjustment, so read which tolerances and specification changes the seller reserved and how the buyer is told of them. The fourth, for a buyer abroad, is duration: every transfer has to be documented and someone has to be empowered to sign and take delivery years later.
Here the file is complicated by a neighbor nobody negotiates with: the air terminal. The neighborhood sits under the approach path, so a building project is not reviewed only by the curaduría urbana, the private office that grants permits, but also by the civil aviation authority, which sets the obstacle limitation surfaces, and by the operator running the airport under concession. That reorders the procedure: before buying with any plan to add height, request the land-use opinion from the District and ask about the aviation ruling, because that is where a seller's assumptions collapse. On top of height there is noise exposure, which never appears on the certificado de tradición y libertad, the registry history and encumbrance certificate, and does appear in the airfield regime, so the exposure sits in the rules over the land rather than in the title itself. The counterparty differs too: a formal neighborhood of long-standing owners, with unsettled sucesiones, estate proceedings, and houses carved into several apartments without registering the split, so compare the original permit against what stands before accepting a per-unit valuation.
What is specific to Crespo
The neighborhood you cross to enter or leave the city: residential, fully built out and pressed against the air terminal, with its own seafront. Family houses and residential buildings sit alongside apartments used for short stays because of how close the terminal is. It is the hinge between downtown and the Zona Norte: the exit to the Anillo Vial and the way into Rafael Núñez airport both run through it.
- what building height the lot allows under the airport approach path, because the aviation restriction stacks on top of District zoning and is the first fact left out when a lot is offered
- whether what stands matches the permit and the registry folio, a common gap in family houses split into apartments without registering the split
- how shoreline protection in front of the property was resolved and which body answers for that work, because it is not the seller
What to verify, step by step
- Ask the curaduría urbana (the private permitting office) for the licencia de construcción and the approved plans, and check what use, area and height that permit actually authorised against what you are being shown. Anything built beyond it is not cured by the deed.
- What the report has to address point by point for an off-plan new construction: which patrimonio autónomo (the trust estate holding buyers' funds) the instalments are paid into and which fiduciaria administers it, because the money should not reach the builder's own account; whether the licencia de construcción has actually been issued or the project is still in prelanzamiento, and what punto de equilibrio (the pre-sale threshold) must be met before building starts and what the signed document says about the return of funds if that threshold is never met, and whether you signed a promesa de compraventa or only an encargo fiduciario (a trust deposit instruction).
- And what the same report should pick up for the sector in Crespo: what building height the lot allows under the airport approach path, because the aviation restriction stacks on top of District zoning and is the first fact left out when a lot is offered; whether what stands matches the permit and the registry folio, a common gap in family houses split into apartments without registering the split and how shoreline protection in front of the property was resolved and which body answers for that work, because it is not the seller.
- Engage the visit with an engineer or architect you hire yourself, not the one the seller offers, and require a written report with dated photographs, a signature and the professional's licence number. Ask Camacol Bolívar who carries out technical surveys in the region and ask for references you can check.
- Agree in writing with the seller on the date of the visit and on access to the property before signing the promesa, and attach the report to the promesa together with the agreed repairs and who pays for them.
- Ask the District whether any administrative proceeding is open against the property for building without a permit or for breaching planning rules, because that follows the property and not the seller.
Mistakes that cost money
- Accepting the report the seller or the developer hands over. The useful report is the one the buyer commissioned and can question.
- Leaving the inspection until after the promesa, when the price is already agreed. Whatever surfaces then is argued from the weaker position.
- Confusing the technical inspection with the title review. One looks at the construction and the other at the chain of ownership; you need both, and not from the same person.
Frequently asked questions
- Can the inspection be done without being in Cartagena?
- Yes, and it usually is: you hire the professional, arrange access with the seller and receive the signed report. What you should not delegate is choosing who does it.
- Does the inspection change with the type of property?
- In substance, yes. What has to be verified on an off-plan new construction comes from the nature of the property —what is privately owned, what is common property, what the permit authorises— and not from a general list of finishes.
- Who pays for repairs the report turns up?
- Whoever agreed to in writing. If the report is attached to the promesa with the fixes and who owes them, you have something to enforce; if it lives in an email, you do not.
Where to check it
- Curadurías Urbanas de Cartagena — whether a current building or subdivision permit exists and exactly what it authorises
- Camacol Bolívar — the industry's own figures on housing starts and launches in Bolívar
- Alcaldía Mayor de Cartagena de Indias — property tax, betterment levies and District procedures
- Cartagena de Indias — the rules of the municipality Crespo belongs to
Official bodies. Specific figures are requested there, not copied from a listing.
Updated 2026-11-06
Interested in a property in this area?
Write to us and we will send you the available options.