Pre-Construction Deposits in Brickell Key: Payment Schedules and Buyer Questions

Buying off-plan in Brickell Key is not paid once: it is paid in instalments spread across the construction period. Knowing when each one falls due, where the money sits and what happens if you are late is the part that decides the risk.

Each instalment leaves your pocket on a fixed date while the building still produces nothing, and those dates do not move because construction slips. If the money comes from abroad you also have to allow for the sending bank's timing, source-of-funds documentation and the value date at the receiving end. And if an instalment misses its date, what happens to everything already paid is set by the contract, not by custom: which is why the schedule and the account holding the money are requested in writing before signing.

What makes Brickell Key different in paperwork is not the view: above each tower there is a master association that governs the whole island. That adds a document the mainland does not produce. Besides the estoppel and your own condominium's records, you need the master entity's certificate and rules, its budget and its dues, which are paid separately from the building's. It also changes who approves what. Move-ins, vendor entry, interior remodeling and even a contractor's access can depend on the island regime and not only on your own board, so a city permit in good order is not by itself enough to start work. Because this is made land with a single point of entry, ask your insurer and the managers how elevation and perimeter maintenance are documented, and who is answerable for the shared edge works, which belong to no single tower. If you are buying from abroad, have your attorney review both bodies of rules together, the tower's and the island's, because they conflict more often than you would expect and a buyer ends up bound by both at once.

What is specific to Brickell Key

A man-made island off Brickell, with a single way in and out and a pedestrian loop that rings the whole island. A closed set of towers, with no street retail beyond the basics. You enter by a single bridge from Brickell Avenue; there is no transit station on the island.

  • what the single access road means during a hurricane evacuation and at afternoon rush hour
  • whether the tower has an open bay view or another tower on the same island blocks it, which is the most frequent complaint here
  • which services you have to leave the island for, and how long that takes

What to verify, step by step

  1. Request the full payment schedule in writing, with the trigger for each instalment: signing, construction start, a building milestone or closing.
  2. Ask which account the money enters, whose name it is in and who may draw on it before delivery, and get the answer in writing.
  3. Ask for the exact clause covering a late instalment: what cure period there is and what happens to money already paid if it is not cured.
  4. Ask for the cancellation clause and the material-change clause, and ask in which cases the money comes back and in which it does not.
  5. Confirm the wire route and the source-of-funds documentation with both your bank and the receiving bank before the first due date, not on the day.
  6. Have the schedule and the deposit clause reviewed by a Florida-licensed attorney before you transfer the first instalment.

Mistakes that cost money

  • Planning the instalments off the brochure schedule instead of the contractual one, which is the only binding version.
  • Wiring without knowing whose name the receiving account is in or who can withdraw the money before delivery.
  • Leaving source-of-funds paperwork to the week of the due date: a banking delay counts as your delay.

Frequently asked questions

What happens if I am late on an instalment?
The contract clause defines it, usually with a cure period and a consequence if it is not met. Request it and have it reviewed before signing, because it is not the same across projects.
Where does the money sit until delivery?
It must state in writing which account it enters and under what arrangement it is held. That is a direct question for the developer and a check for your Florida attorney.
What if the project changes design or developer?
That is covered by the material-change clause and the assignment clause. Ask what counts as a material change in your contract and what right it gives you.
Does wiring from abroad change anything?
It changes the timing and the documentation the banks will ask for. Confirm the route and the requirements with both banks before the first due date.

Where to check it

Official bodies. Specific figures are requested there, not copied from a listing.

Updated 2026-11-06

This article in other languages EspañolPortuguês

Interested in a property in this area?

Write to us and we will send you the available options.

Dimare Collection does not sell or broker property in Miami. This is an informational page: transactions are carried out by brokers licensed in the state of Florida. This text is not legal, tax, immigration or mortgage advice; it describes what to ask and whom to ask. The rules and bodies cited can change: always confirm with the official source. Operated by Nisimblat Consulting SAS.