Dimare Collection

Apartments Under Construction in Midtown Miami: What International Buyers Should Know

A project announced in Midtown Miami and a project actually under construction are not the same thing, and the difference shows up in the county permit record. A buyer abroad can check it without flying in.

Sales material is produced before the building exists: a sales gallery, renderings and a scale model can be ready while the land still has no foundation permit. Knowing where the permit file stands changes what you are buying, because a project with an approved vertical permit and a crane on site carries a different risk from one still in municipal review. That information is public and free, and the seller does not control it.

Midtown is not bought like an inherited neighborhood but as one piece of a master plan approved at once for the whole precinct, and that plan still binds every unit. Above your building's association sit precinct-wide covenants that split maintenance of the interior streets, the shared garage and the common-use spaces between the residential owners and the holders of the ground-floor retail, which can mean two separate billings and two boards that do not decide the same things. Before signing, request the text of those covenants, the budget of the entity that administers them, and the formula by which the residential share is weighed against the commercial one, because that is the usual source of dispute here. It also matters whether your parking space is assigned property, a license to use, or a rental inside a shared structure, since that determines whether it transfers with the unit at all. For a buyer abroad, the useful question to put to management is which of the two entities issues the estoppel and which one has to approve a remodel, and to get the answer in writing before closing.

What is specific to Midtown Miami

A planned development on former rail yards, between Wynwood and the Design District. Mid-rise towers over ground-floor retail, on a new and regular street grid. No rail station; you depend on the car, the trolley and the proximity of Biscayne Boulevard and I-195.

  • whether the unit faces the inner courtyard or the retail street, because of late-night terrace noise
  • how you get in and out at rush hour, because the grid feeds into few exits
  • which part of the garage is for visitors and which for residents

What to verify, step by step

  1. Ask for the project's exact address and parcel number, not the marketing name, because permit files are searched by parcel.
  2. Look that parcel up at the county permitting centre and see which permits are open, closed or merely applied for.
  3. Check the county appraiser's record for what stands on that land today: if it still shows vacant or an older structure, the work has not progressed.
  4. Ask in writing what stage construction is at and request the date of the last approved inspection report, not a verbal description of progress.
  5. If you cannot travel to Midtown Miami, commission a Florida-licensed broker or an independent inspector to visit and send dated site photographs.
  6. Ask about the city or town permit as well, because the municipality and the county run separate processes.

Mistakes that cost money

  • Confusing the sales launch with the construction start: the sales gallery opens long before the structural permit.
  • Accepting undated photographs, or a crane from a neighbouring project, as proof of progress.
  • Assuming an applied-for permit is an approved permit.

Frequently asked questions

How do I know the project I am being offered really exists?
Through the parcel. With the exact address and parcel number you can pull the county permit file and the appraiser's record, and both sources are public and free.
Can I verify progress without travelling to Midtown Miami?
On paper, yes: permits and approved inspections are searchable online. For the physical state of the site it is worth commissioning a visit with dated photographs from someone licensed in Florida.
Which permit shows that construction has started?
It depends on the project and the municipality, which is why you read the whole file rather than trusting a single document. The county permitting centre shows the sequence and the dates.

Where to check it

Official bodies. Specific figures are requested there, not copied from a listing.

Updated 2026-11-06

This article in other languages EspañolPortuguês

Interested in a property in this area?

Write to us and we will send you the available options.

Dimare Collection does not sell or broker property in Miami. This is an informational page: transactions are carried out by brokers licensed in the state of Florida. This text is not legal, tax, immigration or mortgage advice; it describes what to ask and whom to ask. The rules and bodies cited can change: always confirm with the official source. Operated by Nisimblat Consulting SAS.